Projects

Our Projects

Projects have been implemented

  • Implementation of facilities for Factories for ethylene and polyethylene.
  • The completion of the construction work for the ethylene factory.
  • The completion of the construction work of the polyethylene factory.

Projects have been implemented

  1. Implementation the project of soap factory second stage system “Lighting – power-Fire Alarm” in Aleashir Min Ramadan Integrated electrical work.
  2. Implementation the project of oil factory third stage system “Lighting – power-Fire Alarm” in Aleashir Min Ramadan Integrated electrical work.
  3. Implementation the project of glass factory second stage system Lighting – power-Fire Alarm in Aleashir Min Ramadan as well as implementation of the firefighting mechanics Integrated electromechanical works.

Projects have been implemented

Implementation the Arish cement factory System lighting – power-Fire Alarm – control Mechanics the fire fighting Electromechanical Integrated business.

Projects have been implemented

  • Implementation the project of fertilizer factory Alexandria “Abu Qir Fertilizers Company”.
  • “Power-lighting-fire alarm-sound- mechanical works-and control systems.

Projects have been implemented.

  1. Implementation of the Marseille Beach 2 project the first stage Section (a) General palaces and villas and the location of the network low and medium Pressure (all business supply and installation).
  2. Implementation the project of Marseille Beach 2 second stage the networks low and Medium pressure and commercial mall.

Implementation the project of Marseilles Land Alamein The first and second stage low and medium pressure networks And the Villas and buildings section Violets 4. 5. 6 and foll Average and foll (a) and (c) and Aqua Park and The Mall Commercial (business all the supply and installation).

  • Implementation the project of Marseille Beach 3 the first stage Palaces and villas, general, location and Section networks Low and medium pressure and the work of the beach (all business supply and installation)
  • Implementation the project of Marseille Beach 3 work the second stage general location and networks of low average pressure and commercial mall and the front the region (all business supply and installation)
  • Implementation the mall of Marseille Beach 3 north coast internal works networks and all the supply and installation business

Implementation the project blue bay Ain Sokhna general location and the front region (all business supply and installation)

Projects have been implemented

  • Work was completed at the site of Marseille Florence Park
  • Work was completed at Mega Mall Florence

Projects have been implemented

  • The headquarters of the company Marseille Beach Tourism integrated electrical works
  • Replacing and renewing aqua park North Coast integrated electrical works

Projects have been implemented.

  • Kurkufadu San Stefano electric integrated business
  • Kurkufadu northern coast kilo72 an integrated electrical works
  • Kurkufadu Elalamin integrated electrical works
  • Works at Marseille Beach 2 integrated electrical works
  • Restaurant chain khalati integrated electrical works
  • Works for The Company headquartered goals integrated electrical works
  • The implementation of the retail chain places of the northern coast of integrated electrical works

Projects have been implemented

  • Implementation of all works of marketing for the company places on the level Republic of integrated electrical work
  • Replacement and renovation beaches of the following villages. Marseille Beach 1 and Beach 2 Beach 3 integrated electrical work
  • Maintenance of all villages and hotels of the company at Over the year at the level of the Republic of electric work

Projects have been implemented

  • The implementation of the project village Downtown Marina kilo 92 General site networks and public low and medium pressure and the front region integrated electrical works
  • Replacing and renewing Network Downtown Mall Alexandria low-pressure and medium-integrated electrical works

Projects have been implemented

The implementation of the project Al Oroba Mall Road intersection with the converter through the north coast integrated electrical work.

Projects have been implemented

The implementation the Project of Vista Village Marina North Coast Kilo 107 public sector buildings, location, networks of low pressure and medium-integrated electrical work

Projects have been implemented

  • The implementation the of project El Safwa Tower 1 Bualeno Alexandria integrated electrical work
  • The implementation of the El Safwa Tower 2 Muharram Bik project integrated electrical work

Projects have been implemented

The implementation of a project to replacement and renovation First Amreya factory for the manufacture of sheet iron integrated electrical work

Projects have been implemented

The implementation of the main building of the company Kafr Abdo project Alexandria integrated electrical work

Projects have been implemented

The implementation of the Jasmine Villas – 36Villa – Kilo 71 north coast integrated electrical work

 Projects have been implemented

  • The implementation of the project gypsum factory in the region the fourth Burj Al-Arabs initial phase integrated electromechanical works. 
  • The implementation of the new administrative building project Amreya Cement factory Agharbanaat integrated electrical work.

Projects have been implemented

The implementation of the Millennium Project Health Club Sports Rushdie integrated electrical work.

Projects have been implemented

Supply of the LED headlamp alternative 400-watt sodium lights, as well as 250 watts for the West Delta Electricity Company for the production of electricity stations and Kafr El-Dawar Damanhur and Sidi Krier as well as the Abu Qir station.

Projects have been implemented

  • Calibration OF ALL INSTRUMENTS
  • Fabrication and installation Cable Tray
  • Fabrication Frames and installation all Types of Panels
  • Fabrication Stand for INSTRUMENTS and installation all types of INSTRUMENTS
  • Connection of all type of table
  • Supply of cables Tray ,Cable and pipes MT

Projects have been implemented

  • Calibration OF ALL INSTRUMENTS
  • Fabrication and installation Cable Tray
  • Fabrication Frames and installation all Types of Panels
  • Fabrication Stand for INSTRUMENTS and installation all types of INSTRUMENTS
  • Connection of all type of table

Projects have been implemented

  • Calibration OF ALL INSTRUMENTS
  • Fabrication and installation Cable Tray
  • Fabrication Frames and installation all Types of Panels
  • Fabrication Stand for INSTRUMENTS and installation all types of INSTRUMENTS
  • Connection of all type of table
  • removal and installation mobilize oils machines

Projects have been implemented

  • Calibration OF ALL INSTRUMENTS
  • Fabrication and installation Cable Tray
  • Fabrication Frames and installation all Types of Panels
  • Fabrication Stand for INSTRUMENTS and installation all types of INSTRUMENTS

Projects have been implemented

  • Calibration OF ALL INSTRUMENTS.
  • Fabrication and installation Cable Tray.
  • Fabrication Frames and installation all Types of Panels.
  • Fabrication Stand for INSTRUMENTS and installation all types of INSTRUMENTS.
  • Connection of all type of table

Projects have been implemented

  • Calibration OF ALL INSTRUMENTS
  • Fabrication and installation Cable Tray
  • Fabrication Frames and installation all Types of Panels
  • Fabrication Stand for INSTRUMENTS and installation all types of INSTRUMENTS
  • Connection of all type of table

Projects have been implemented

  • Calibration OF ALL INSTRUMENTS
  • Fabrication and installation Cable Tray
  • Fabrication Frames and installation all Types of Panels
  • Fabrication Stand for INSTRUMENTS and installation all types of INSTRUMENTS
  • Connection of all type of table